NOTE: Read the entire instruction manual before starting the
installation.
This symbol indicates a change since the last issue.
Index Page
DIMENSIONAL DRAWING........................................................2
SAFETY CONSIDERATIONS.....................................................3
Clearances to Combustibles......................................................3
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS ....3-4
INTRODUCTION..........................................................................4
APPLICATIONS ......................................................................4-11
General ......................................................................................4
Upflow Applications..............................................................4-7
Downflow Applications.........................................................7-8
Horizontal Left (Supply-Air Discharge) Applications .........8-9
Horizontal Right (Supply-Air Discharge) Applications.....9-11
LOCATION ............................................................................11-12
General...............................................................................11-12
Furnace Location Relative to Cooling Equipment ................12
Hazardous Locations...............................................................12
INSTALLATION....................................................................13-17
Leveling Legs (If Desired).....................................................13
Installation In Upflow or Downflow Applications ..........13-15
Installation In Horizontal Applications..................................15
Filter Arrangement..................................................................16
Bottom Closure Panel.............................................................16
Gas Piping...............................................................................17
ELECTRICAL CONNECTIONS...........................................17-20
115-v Wiring......................................................................17-18
24-v Wiring.............................................................................18
Wiring Diagram ......................................................................19
Accessories..............................................................................20
DIRECT VENTING ...............................................................21-29
Removal of Existing Furnaces from
Common Vent Systems.....................................................21
Combustion-Air and Vent Piping .....................................21-27
Concentric Vent and Combustion-Air Termination
Kit Installation..............................................................27-29
Multiventing and Vent Termination.......................................29
CONDENSATE DRAIN ........................................................29-31
General ....................................................................................29
Application.........................................................................29-31
Condensate Drain Protection..................................................31
SEQUENCE OF OPERATION..............................................31-33
Heating Mode ....................................................................31-32
Cooling Mode .........................................................................32
Continuous Blower Mode.......................................................32
Heat Pump Mode....................................................................32
Component Test.................................................................32-33
START-UP PROCEDURES ..................................................33-41
General ....................................................................................33
Prime Condensate Trap With Water......................................33
Purge Gas Lines......................................................................34
Adjustments .......................................................................34-41
Set Gas Input Rate ............................................................34-40
Set Temperature Rise ........................................................40-41
Blower Off Delay (Heat Mode).............................................41
Set Thermostat Heat Anticipator............................................41
CHECK SAFETY CONTROLS..................................................41
Check Primary Limit Control.................................................41
Check Pressure Switch ...........................................................41
CHECKLIST...........................................................................41-42
A93040
®
ama
CANADIAN GAS ASSOCIATION
APPROVED
R
As an ENERGY STAR
SM
Partner, Bryant/Day &
Night has determined that
this product meets the EN-
ERGY STAR guidelines
for energy efficiency.
CERTIFICATION OF MANUFACTURING SITE
Fig. 1—Multipoise Orientations
A93041
UPFLOW
DOWNFLOW
HORIZONTAL
LEFT
AIRFLOW
AIRFLOW
AIRFLOW
AIRFLOW
HORIZONTAL
RIGHT
installation, start-up,
and operating instructions
4-WAY MULTIPOISE
FIXED-CAPACITY DIRECT-VENT
CONDENSING GAS FURNACE
Cancels: II 340M-40-3 II 340M-40-4
12-96
340MAV
Series D
—1—
Zobrazit stránku 0
1 2 3 4 5 6 ... 43 44

Shrnutí obsahu

Strany 1 - Series D

NOTE: Read the entire instruction manual before starting theinstallation.This symbol → indicates a change since the last issue.Index PageDIMENSIONAL D

Strany 2 - Fig. 2—Dimensional Drawing

1. Remove 3 tubes connected to condensate trap.2. Remove trap from blower shelf by gently pushing tabsinward and rotating trap.3. Remove casing hole f

Strany 3

2. Extend collector box pressure tube (green label) which waspreviously connected to condensate trap relief port connec-tion by splicing to small diam

Strany 4

CAUTION: If these furnaces are used during construc-tion when adhesives, sealers, and/or new carpets arebeing installed, make sure all combustion and

Strany 5

INSTALLATIONI. LEVELING LEGS (IF DESIRED)When furnace is used in upflow position with side inlet(s), levelinglegs may be desired. (See Fig. 12.) Insta

Strany 6 - 2-IN. CPVC STREET

TABLE 1—OPENING DIMENSIONS (IN.)FURNACECASINGWIDTHAPPLICATIONPLENUM OPENING FLOOR OPENINGABCD17-1/2Upflow Applications 16 24-1/8 16-5/8 24-3/4Downflow

Strany 7

III. INSTALLATION IN HORIZONTAL APPLICATIONSThese furnaces can be installed horizontally in either horizontalleft or right discharge position. In a cr

Strany 8

IV. FILTER ARRANGEMENTCAUTION: Never operate unit without a filter or withblower access panel removed.Factory-supplied washable framed filters are shi

Strany 9 - pipe section is recommended

VI. GAS PIPINGGas piping must be installed in accordance with national and localcodes. Refer to current edition of NFGC. Canadian installationsmust be

Strany 10

NOTE: Proper polarity must be maintained for 115-v wiring. Ifpolarity is incorrect, control center LED status indicator light willflash rapidly and fu

Strany 11

Fig. 24—Wiring DiagramA95087PCBBLOWER OFF DELAYSELECTION CHART90 SEC135 SEC180 SEC225 SECGVRHI/LORELAYSEC-1SEC-2WHTPL1321654987LEDTEST/TWINBLOWEROFFDE

Strany 12 - PROTECTION REQUIRED

Fig. 2—Dimensional DrawingDIMENSIONS (IN.)UNIT SIZE A D E024040 17-1/2 15-7/8 16036040 17-1/2 15-7/8 16024060 17-1/2 15-7/8 16036060 17-1/2 15-7/8 160

Strany 13

III. ACCESSORIES1. Electronic Air Cleaner (EAC)Two quick-connect terminals marked EAC-1 and EAC-2are provided for EAC connection. (See Fig. 25.) These

Strany 14

DIRECT VENTINGThe 340MAV Furnaces require a dedicated (one 340MAV furnaceonly) direct-vent system. In a direct-vent system, all air forcombustion is t

Strany 15

CAUTION: When combustion-air pipe is installedabove a suspended ceiling, pipe must be insulated with3/8-in. thick Armaflex-type insulation. Combustion

Strany 16 - FRONT FILLER

f. Drill a 1/8-in. hole in 2-in. combustion-air pipe usinghole in intake housing as a guide.g. Install a field-supplied No. 6 or No. 8 sheet metal scr

Strany 17 - Table 10-2 NFPA 54-1996

TABLE 6—MAXIMUM ALLOWABLE PIPE LENGTH (FT)ALTITUDE UNIT SIZETERMINATIONTYPEPIPE DIA(IN.)*NUMBER OF 90° ELBOWS1234560 to 20000240400360402 Pipe or 2-In

Strany 18

TABLE 6—MAXIMUM ALLOWABLE PIPE LENGTH (FT) ContinuedALTITUDE UNIT SIZETERMINATIONTYPEPIPE DIA(IN.)*NUMBER OF 90° ELBOWS1234 5 64001 to 5000‡0240400360

Strany 19 - Fig. 24—Wiring Diagram

b. Reposition neoprene inducer housing outlet cap andclamp to appropriate unused inducer housing connec-tion. Tighten clamp.WARNING: Inducer housing o

Strany 20

9. While cement is still wet, twist pipe into socket with 1/4turn. Be sure pipe is fully inserted into fitting socket.10. Wipe excess cement from join

Strany 21

Fig. 33—Sidewall Termination of 12 in. or MoreA87225MAINTAIN 12 IN.CLEARANCEABOVE HIGHESTANTICIPATED SNOWLEVEL OR GRADE,WHICHEVER ISGREATE

Strany 22

2. Cut 2 holes, 1 for each pipe, of appropriate size for pipe sizebeing used.3. Loosely install elbow in bracket and place assembly oncombustion-air p

Strany 23

SAFETY CONSIDERATIONSInstalling and servicing heating equipment can be hazardous due togas and electrical components. Only trained and qualified perso

Strany 24 - See notes on page 26

Fig. 38—Sidewall Termination of 12 in. or Less(Dimension "A" is Touching or 2-In. Maximum Separation)A96129ACOMBUSTION AIRCOMBUSTION AIRVE

Strany 25

See Fig. 40 for example of possible field drain attachment using1/2-in. CPVC or PVC tee for vent and A/C or humidifier drainconnection.Outdoor drainin

Strany 26

6. Blower off delay—When thermostat is satisfied, circuitbetween R-W is opened, de-energizing gas valve (stoppinggas flow to burners) and humidifier.

Strany 27

WARNING: Blower access panel door switch opens115-v power to control center. No component operationcan occur. Caution must be taken when manually clos

Strany 28

III. PURGE GAS LINESIf not previously done, purge lines after all connections have beenmade and check for leaks.WARNING: Never purge a gas line into a

Strany 29

→ TABLE 8—MODEL 340MAV ORIFICE SIZE AND MANIFOLD PRESSURE FOR CORRECT INPUTFOR USE WITH 040 THROUGH 120 SIZE FURNACES ONLY(TABULATED DATA BASED ON 20,

Strany 30

→ TABLE 8—MODEL 340MAV ORIFICE SIZE AND MANIFOLD PRESSURE FOR CORRECT INPUT ContinuedFOR USE WITH 040 THROUGH 120 SIZE FURNACES ONLY(TABULATED DATA BA

Strany 31 - (3 WRAPS MINIMUM)

→ TABLE 8—MODEL 340MAV ORIFICE SIZE AND MANIFOLD PRESSURE FOR CORRECT INPUT ContinuedFOR USE WITH 040 THROUGH 120 SIZE FURNACES ONLY(TABULATED DATA BA

Strany 32

→ TABLE 9—MODEL 340MAV ORIFICE SIZE AND MANIFOLD PRESSURE FOR CORRECT INPUTFOR USE WITH 140 SIZE FURNACES ONLY(TABULATED DATA BASED ON 23,000 BTUH PER

Strany 33

→ TABLE 9—MODEL 340MAV ORIFICE SIZE AND MANIFOLD PRESSURE FOR CORRECT INPUT ContinuedFOR USE WITH 140 SIZE FURNACES ONLY(TABULATED DATA BASED ON 23,00

Strany 34

6. Before removing a new control from its container, dis-charge your body’s electrostatic charge to ground to protectthe control from damage. If the c

Strany 35

f. Look through sight glass in burner enclosure and checkburner flame. Burner flame should be clear blue, almosttransparent. (See Fig. 45.)3. Verify n

Strany 36

3. Adjust temperature rise by adjusting blower speed. Increaseblower speed to reduce temperature rise. Decrease blowerspeed to increase temperature ri

Strany 37

CHECKLIST—INSTALLATIONLOAD CALCULATION____________ Heating Load (Btuh)____________ Cooling Load (Btuh)____________ Furnace Model SelectionCOMBUSTION A

Strany 38

—43—

Strany 39

A94328SERVICE TRAININGPackaged Service Training programs are an excellent way to increase your knowledge of the equipment discussed in this manual, in

Strany 40 - MANIFOLD

and also by a color label on each tube. These tubes areidentified as follows: collector box drain tube (blue label),inducer housing drain tube (violet

Strany 41 - 10 TURNS AROUND JAWS

D. Condensate Trap Tubing (Alternate UpflowOrientation)NOTE: See Fig. 6 or tube routing label on main furnace door toconfirm location of these tubes.1

Strany 42 - CHECKLIST—INSTALLATION

H. Condensate Trap Freeze ProtectionRefer to Condensate Drain Protection section for recommenda-tions and procedures.III. DOWNFLOW APPLICATIONSA downf

Strany 43

d. Use inducer housing drain tube (violet label and factory-supplied in loose parts bag) to connect LOWER inducerhousing drain connection to the conde

Strany 44 - SERVICE TRAINING

CAUTION: Local codes may require a drain pan underentire furnace and condensate trap when a condensingfurnace is used in an attic application or over